Our Specialization
- Building a substation for Power Distribution like 33/22KV or 22/11KV for DISCOM.
- Building a Pumping station along with SCADA & Automation for Water management system.
- Commissioning of HT cable along with Laying Testing upto the substation with provision of SCADA comparable RMU & Allied Work.
- Installation of Solar Power Generation plant as per the customer requirement along with net metering.
- Supply installation of EV charging station for electric Vehicle as per the customer vehicle requirement.
![energy-1685945_1280](http://eleconenergysolutions.com/wp-content/uploads/2022/01/energy-1685945_1280.jpg)
![substation-1705947_1280](http://eleconenergysolutions.com/wp-content/uploads/2022/01/substation-1705947_1280.jpg)
![photovoltaic-system-2742302_1280](http://eleconenergysolutions.com/wp-content/uploads/2022/01/photovoltaic-system-2742302_1280.jpg)
![electric-car-2783573_1280](http://eleconenergysolutions.com/wp-content/uploads/2022/01/electric-car-2783573_1280-1.jpg)
Previous
Next